Satisfactory Space Elevator: Parts & Phases
The Space Elevator drives the whole game through five Project Assembly phases. Here is exactly what each phase ships, with a production calculator for every part so you can build the lines that feed it.
Phase 1 – Distribution Platform
Phase 2 – Construction Dock
- Smart Plating×1,000
- Versatile Framework×1,000
- Automated Wiring×100
Phase 3 – Main Body
- Versatile Framework×2,500
- Modular Engine×500
- Adaptive Control Unit×100
Phase 4 – Propulsion
Phase 5 – Assembly
- Nuclear Pasta×1,000
- Biochemical Sculptor×1,000
- AI Expansion Server×256
- Ballistic Warp Drive×200
How to plan it
The Space Elevator takes a fixed total of each part, not a per-minute rate — so what matters is throughput versus patience. Pick a comfortable parts-per-minute, build that line with the production calculator (each part above links to its own calculator), and let it run while you tech up. Quantities here are the official Project Assembly costs; click any part to see its machines, resources, and power.