SatisfactoryCalculatorWiki · Tools
Automated Wiring

Satisfactory Automated Wiring Calculator

One Assembler makes 2.5 Automated Wiring/min from 2.5 Stator + 50 Cable per minute (15 MW). Space Elevator Phase 2 needs 100 Automated Wiring — 40 minutes from one Assembler, or 20 minutes at 5/min.

39.2
Machines needed
3
Raw inputs
0
Byproducts
235 MW
Power estimate

The standard 5/min connection diagram uses 114.708 MW at the listed clocks or 117.333 MW at full-clock equivalents. Both include standard supporting production and exclude extraction, pumps and byproduct processing. The calculator uses full-clock equivalents for your selected rate and recipes. See whole-building plans.

Every Automated Wiring recipe compared

Rates and recipe power are per building at 100% clock, without Somersloops. The full raw-resource bill expands Stator, Cable and every other intermediate using the standard supporting recipes named below. Chain power includes those production buildings; resource extraction, pumps and byproduct processing are additional.

Game data v1.2.3.1 exported 2026-06-25 · computed 2026-11-08. Data sources and method. Calculations by SatisfactoryCalculator.net · Report a correction. Inputs are per Automated Wiring; MW per Automated Wiring/min measures sustained production.
Recipe / buildingAutomated Wiring/minInputs / Automated WiringProduction power
Automated WiringAssembler · standard
2.5per building at 100%
Direct inputs
  • 1 Stator
  • 20 Cable
Full raw-resource bill
  • 4.5 Iron Ore
  • 4.5 Coal
  • 24 Copper Ore
Byproducts / Automated Wiring: None
15 MW / building6 MW / Automated Wiring/min23.467 MW / Automated Wiring/min including support
Automated Speed WiringManufacturer · alternate
7.5per building at 100%
Direct inputs
  • 0.5 Stator
  • 10 Wire
  • 0.25 High-Speed Connector
Full raw-resource bill
  • 2.25 Iron Ore
  • 2.25 Coal
  • 10.5 Copper Ore
  • 8.4 Caterium Ore
  • 1.5 m³ Crude Oil
Byproducts / Automated Wiring:
  • 0.5 m³ Heavy Oil Residue
55 MW / building7.333 MW / Automated Wiring/min21.747 MW / Automated Wiring/min including support

Byproducts receive no material or power credit. Keep any supporting recipe’s surplus outlet flowing into a consuming process; processing requires additional buildings and power.

Which Automated Wiring recipe should I use?

  • For a simple Space Elevator supply line: Automated Wiring uses Stators and Cable with standard steel and copper support. Choose it when you want to avoid the High-Speed Connector chain.
  • When High-Speed Connectors are available: Automated Speed Wiring uses less copper with standard support, but adds Caterium and oil supply chains; choose it when High-Speed Connectors are already available.

See alternate-recipe resource comparisons for other production chains.

Space Elevator Phase 2: 100 Automated Wiring

Deliver 100 Automated Wiring as one part of Phase 2, alongside 1,000 Smart Plating and 1,000 Versatile Framework. The complete delivery unlocks Tiers 5 and 6. This is a batch quantity at 1× requirements. With standard supporting recipes and no stored intermediates, the 100 Automated Wiring alone require:

  • 450 Iron Ore
  • 450 Coal
  • 2,400 Copper Ore
  • 2.5/min standard plan: 40 minutes of supplied production for the batch. See its Assemblers, upstream buildings, raw resources/min and MW in the linked plan.
  • 5/min standard plan: 20 minutes of supplied production for the batch. See its Assemblers, upstream buildings, raw resources/min and MW in the linked plan.
  • 10/min standard plan: 10 minutes of supplied production for the batch. See its Assemblers, upstream buildings, raw resources/min and MW in the linked plan.
  • 20/min standard plan: 5 minutes of supplied production for the batch. See its Assemblers, upstream buildings, raw resources/min and MW in the linked plan.

These times assume the line is already supplied; startup and delivery add time. Use the standard recipe for a Stator-and-Cable line, or compare Automated Speed Wiring if High-Speed Connector production and the alternate are available. Space Elevator phase guide.

Automated Wiring production plans

Start with the standard 5/min connection diagram below. Compare 2.5, 5, 10, 20 /min with either recipe. Every plan includes all upstream production buildings.

Build the whole counts and set each recipe group to its listed clock. Parentheses show fractional full-clock equivalents, not extra machines. Shared intermediate production is combined across all input branches. Split each shared output between the downstream recipes at their required rates. Match extraction and belt or pipe capacity to the raw-resource rates below.

Automated Wiring — Automated Wiring/min, all production buildings, raw resources/min and total production power. Game data v1.2.3.1 exported 2026-06-25 · computed 2026-11-08.
Target /minWhole buildingsRaw resources & byproducts /minTotal production MW
2.5Automated Wiring/min · one Assembler at 100%Calculate 2.5/min with Automated WiringAll targets
12 total
  • 11.25 Iron Ore
  • 11.25 Coal
  • 60 Copper Ore
54.94 MWat listed clocks58.667 MW at full-clock equivalents
All 12 buildings and clocks
  • 1 × Assembler @ ≈100%(1 equivalent) · Automated Wiring
  • 1 × Assembler @ ≈50%(0.5 equivalent) · Stator
  • 1 × Constructor @ ≈37.5%(0.375 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈25%(0.25 equivalent) · Steel Ingot
  • 4 × Constructor @ ≈100%(4 equivalent) · Wire
  • 2 × Smelter @ ≈100%(2 equivalent) · Copper Ingot
  • 2 × Constructor @ ≈83.3333%(1.667 equivalent) · Cable
5Automated Wiring/minCalculate 5/min with Automated WiringAll targets
21 total
  • 22.5 Iron Ore
  • 22.5 Coal
  • 120 Copper Ore
114.708 MWat listed clocks117.333 MW at full-clock equivalents
All 21 buildings and clocks
  • 2 × Assembler @ ≈100%(2 equivalent) · Automated Wiring
  • 1 × Assembler @ ≈100%(1 equivalent) · Stator
  • 1 × Constructor @ ≈75%(0.75 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈50%(0.5 equivalent) · Steel Ingot
  • 8 × Constructor @ ≈100%(8 equivalent) · Wire
  • 4 × Smelter @ ≈100%(4 equivalent) · Copper Ingot
  • 4 × Constructor @ ≈83.3333%(3.333 equivalent) · Cable
10Automated Wiring/minCalculate 10/min with Automated WiringAll targets
40 total
  • 45 Iron Ore
  • 45 Coal
  • 240 Copper Ore
233.72 MWat listed clocks234.667 MW at full-clock equivalents
All 40 buildings and clocks
  • 4 × Assembler @ ≈100%(4 equivalent) · Automated Wiring
  • 2 × Assembler @ ≈100%(2 equivalent) · Stator
  • 2 × Constructor @ ≈75%(1.5 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈100%(1 equivalent) · Steel Ingot
  • 16 × Constructor @ ≈100%(16 equivalent) · Wire
  • 8 × Smelter @ ≈100%(8 equivalent) · Copper Ingot
  • 7 × Constructor @ ≈95.2381%(6.667 equivalent) · Cable
20Automated Wiring/minCalculate 20/min with Automated WiringAll targets
79 total
  • 90 Iron Ore
  • 90 Coal
  • 480 Copper Ore
468.502 MWat listed clocks469.333 MW at full-clock equivalents
All 79 buildings and clocks
  • 8 × Assembler @ ≈100%(8 equivalent) · Automated Wiring
  • 4 × Assembler @ ≈100%(4 equivalent) · Stator
  • 3 × Constructor @ ≈100%(3 equivalent) · Steel Pipe
  • 2 × Foundry @ ≈100%(2 equivalent) · Steel Ingot
  • 32 × Constructor @ ≈100%(32 equivalent) · Wire
  • 16 × Smelter @ ≈100%(16 equivalent) · Copper Ingot
  • 14 × Constructor @ ≈95.2381%(13.333 equivalent) · Cable
Automated Speed Wiring — Automated Wiring/min, all production buildings, raw resources/min and total production power. Game data v1.2.3.1 exported 2026-06-25 · computed 2026-11-08.
Target /minWhole buildingsRaw resources & byproducts /minTotal production MW
2.5Automated Wiring/minCalculate 2.5/min with Automated Speed WiringAll targets
14 total
  • 5.625 Iron Ore
  • 5.625 Coal
  • 26.25 Copper Ore
  • 21 Caterium Ore
  • 3.75 m³ Crude Oil
Byproducts /min:
  • 1.25 m³ Heavy Oil Residue
37.772 MWat listed clocks54.367 MW at full-clock equivalents
All 14 buildings and clocks
  • 1 × Manufacturer @ ≈33.3333%(0.333 equivalent) · Automated Speed Wiring
  • 1 × Assembler @ ≈25%(0.25 equivalent) · Stator
  • 1 × Constructor @ ≈18.75%(0.188 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈12.5%(0.125 equivalent) · Steel Ingot
  • 2 × Constructor @ ≈79.1667%(1.583 equivalent) · Wire
  • 1 × Smelter @ ≈87.5%(0.875 equivalent) · Copper Ingot
  • 1 × Manufacturer @ ≈16.6667%(0.167 equivalent) · High-Speed Connector
  • 1 × Constructor @ ≈58.3333%(0.583 equivalent) · Quickwire
  • 1 × Smelter @ ≈46.6667%(0.467 equivalent) · Caterium Ingot
  • 1 × Constructor @ ≈20.8333%(0.208 equivalent) · Cable
  • 1 × Assembler @ ≈8.3333%(0.083 equivalent) · Circuit Board
  • 1 × Constructor @ ≈12.5%(0.125 equivalent) · Copper Sheet
  • 1 × Refinery @ ≈12.5%(0.125 equivalent) · Plastic
5Automated Wiring/minCalculate 5/min with Automated Speed WiringAll targets
18 total
  • 11.25 Iron Ore
  • 11.25 Coal
  • 52.5 Copper Ore
  • 42 Caterium Ore
  • 7.5 m³ Crude Oil
Byproducts /min:
  • 2.5 m³ Heavy Oil Residue
88.836 MWat listed clocks108.733 MW at full-clock equivalents
All 18 buildings and clocks
  • 1 × Manufacturer @ ≈66.6667%(0.667 equivalent) · Automated Speed Wiring
  • 1 × Assembler @ ≈50%(0.5 equivalent) · Stator
  • 1 × Constructor @ ≈37.5%(0.375 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈25%(0.25 equivalent) · Steel Ingot
  • 4 × Constructor @ ≈79.1667%(3.167 equivalent) · Wire
  • 2 × Smelter @ ≈87.5%(1.75 equivalent) · Copper Ingot
  • 1 × Manufacturer @ ≈33.3333%(0.333 equivalent) · High-Speed Connector
  • 2 × Constructor @ ≈58.3333%(1.167 equivalent) · Quickwire
  • 1 × Smelter @ ≈93.3333%(0.933 equivalent) · Caterium Ingot
  • 1 × Constructor @ ≈41.6667%(0.417 equivalent) · Cable
  • 1 × Assembler @ ≈16.6667%(0.167 equivalent) · Circuit Board
  • 1 × Constructor @ ≈25%(0.25 equivalent) · Copper Sheet
  • 1 × Refinery @ ≈25%(0.25 equivalent) · Plastic
10Automated Wiring/minCalculate 10/min with Automated Speed WiringAll targets
26 total
  • 22.5 Iron Ore
  • 22.5 Coal
  • 105 Copper Ore
  • 84 Caterium Ore
  • 15 m³ Crude Oil
Byproducts /min:
  • 5 m³ Heavy Oil Residue
194.779 MWat listed clocks217.467 MW at full-clock equivalents
All 26 buildings and clocks
  • 2 × Manufacturer @ ≈66.6667%(1.333 equivalent) · Automated Speed Wiring
  • 1 × Assembler @ ≈100%(1 equivalent) · Stator
  • 1 × Constructor @ ≈75%(0.75 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈50%(0.5 equivalent) · Steel Ingot
  • 7 × Constructor @ ≈90.4762%(6.333 equivalent) · Wire
  • 4 × Smelter @ ≈87.5%(3.5 equivalent) · Copper Ingot
  • 1 × Manufacturer @ ≈66.6667%(0.667 equivalent) · High-Speed Connector
  • 3 × Constructor @ ≈77.7778%(2.333 equivalent) · Quickwire
  • 2 × Smelter @ ≈93.3333%(1.867 equivalent) · Caterium Ingot
  • 1 × Constructor @ ≈83.3333%(0.833 equivalent) · Cable
  • 1 × Assembler @ ≈33.3333%(0.333 equivalent) · Circuit Board
  • 1 × Constructor @ ≈50%(0.5 equivalent) · Copper Sheet
  • 1 × Refinery @ ≈50%(0.5 equivalent) · Plastic
20Automated Wiring/minCalculate 20/min with Automated Speed WiringAll targets
44 total
  • 45 Iron Ore
  • 45 Coal
  • 210 Copper Ore
  • 168 Caterium Ore
  • 30 m³ Crude Oil
Byproducts /min:
  • 10 m³ Heavy Oil Residue
417.208 MWat listed clocks434.933 MW at full-clock equivalents
All 44 buildings and clocks
  • 3 × Manufacturer @ ≈88.8889%(2.667 equivalent) · Automated Speed Wiring
  • 2 × Assembler @ ≈100%(2 equivalent) · Stator
  • 2 × Constructor @ ≈75%(1.5 equivalent) · Steel Pipe
  • 1 × Foundry @ ≈100%(1 equivalent) · Steel Ingot
  • 13 × Constructor @ ≈97.4359%(12.667 equivalent) · Wire
  • 7 × Smelter @ ≈100%(7 equivalent) · Copper Ingot
  • 2 × Manufacturer @ ≈66.6667%(1.333 equivalent) · High-Speed Connector
  • 5 × Constructor @ ≈93.3333%(4.667 equivalent) · Quickwire
  • 4 × Smelter @ ≈93.3333%(3.733 equivalent) · Caterium Ingot
  • 2 × Constructor @ ≈83.3333%(1.667 equivalent) · Cable
  • 1 × Assembler @ ≈66.6667%(0.667 equivalent) · Circuit Board
  • 1 × Constructor @ ≈100%(1 equivalent) · Copper Sheet
  • 1 × Refinery @ ≈100%(1 equivalent) · Plastic

Power at the listed clocks uses buildings × base MW × (clock / 100)1.321929. The calculator uses fractional full-clock equivalents. Displayed values are rounded; use the target rate to set production. Resource extraction, pumps and byproduct processing are additional. Use the miner calculator for solid-resource extraction and belt limits.

Download Automated Wiring comparison data (JSON)

Automated Wiring 5/min build order and connection diagram (standard recipe)

Build in dependency order below. Each row is one recipe group at a uniform clock. Ore extraction is separate: feed the listed raw rates into these production buildings. This standard chain uses Steel Pipes, Stators and Cable; Iron Rods and Screws are not required.

5 Automated Wiring/min connection diagram. Follow the named destinations; all link rates are per minute. Each card is one production group.
  1. Steel Ingot
    1 Foundry @ 50% each

    Iron Ore → 22.5 Iron Ore/min; Coal → 22.5 Coal/min

    Steel Ingot 22.5/min → 22.5/min to Steel Pipe

  2. Steel Pipe
    1 Constructor @ 75% each

    Steel Ingot → 22.5 Steel Ingot/min

    Steel Pipe 15/min → 15/min to Stator

  3. Copper Ingot
    4 Smelters @ 100% each

    Copper Ore → 120 Copper Ore/min

    Copper Ingot 120/min → 120/min to Wire

  4. Wire
    8 Constructors @ 100% each

    Copper Ingot → 120 Copper Ingot/min

    Wire 240/min → 40/min to Stator / 200/min to Cable

  5. Stator
    1 Assembler @ 100% each

    Steel Pipe → 15 Steel Pipe/min; Wire → 40 Wire/min

    Stator 5/min → 5/min to Automated Wiring

  6. Cable
    4 Constructors @ 83.3333% each

    Wire → 200 Wire/min

    Cable 100/min → 100/min to Automated Wiring

  7. Automated Wiring
    2 Assemblers @ 100% each

    Stator → 5 Stator/min; Cable → 100 Cable/min

    Automated Wiring 5/min → storage or Space Elevator delivery

Automated Wiring build list and minimum trunk belts
StageWhole buildings @ clockInputs /min · minimum beltOutputs /min · minimum belt
Steel Ingot
1 × Foundry @ ≈50% each0.5 full-clock equivalents
  • 22.5 Iron OreMk.1 · 60/min capacity
  • 22.5 CoalMk.1 · 60/min capacity
  • 22.5 Steel IngotMk.1 · 60/min capacity
Steel Pipe
1 × Constructor @ ≈75% each0.75 full-clock equivalents
  • 22.5 Steel IngotMk.1 · 60/min capacity
  • 15 Steel PipeMk.1 · 60/min capacity
Copper Ingot
4 × Smelter @ ≈100% each4 full-clock equivalents
  • 120 Copper OreMk.2 · 120/min capacity
  • 120 Copper IngotMk.2 · 120/min capacity
Wire
8 × Constructor @ ≈100% each8 full-clock equivalents
  • 120 Copper IngotMk.2 · 120/min capacity
  • 240 WireMk.3 · 270/min capacity
Stator
1 × Assembler @ ≈100% each1 full-clock equivalent
  • 15 Steel PipeMk.1 · 60/min capacity
  • 40 WireMk.1 · 60/min capacity
  • 5 StatorMk.1 · 60/min capacity
Cable
4 × Constructor @ ≈83.3333% each3.333 full-clock equivalents
  • 200 WireMk.3 · 270/min capacity
  • 100 CableMk.2 · 120/min capacity
Automated Wiring
2 × Assembler @ ≈100% each2 full-clock equivalents
  • 5 StatorMk.1 · 60/min capacity
  • 100 CableMk.2 · 120/min capacity
  • 5 Automated WiringMk.1 · 60/min capacity

Automated Wiring conveyor links and manifolds

Merge each recipe group onto its output trunk, then branch shared materials to downstream manifolds. Minimum belt tiers are capacity requirements, not equal-split ratios. Underclocked consumers set demand; let manifolds fill before judging throughput. Balanced alternatives use the existing splitter calculator’s tree or loopback construction; their common segment carries the fresh rate × leaves / outputs and may need a faster belt. The counts below describe a serial manifold construction using two active ports per splitter or merger; unused ports stay disconnected.

LinkTrunk /min · beltEach receiving machineManifold splitters
Iron OreIron Ore → Steel Ingot
22.5Mk.1
22.5/minMk.1
0Balanced alternative: 0 splitters + 0 return mergers (direct belt)
CoalCoal → Steel Ingot
22.5Mk.1
22.5/minMk.1
0Balanced alternative: 0 splitters + 0 return mergers (direct belt)
Steel IngotSteel Ingot → Steel Pipe
22.5Mk.1
22.5/minMk.1
0Balanced alternative: 0 splitters + 0 return mergers (direct belt)
Copper OreCopper Ore → Copper Ingot
120Mk.2
30/minMk.1
3Balanced alternative: 3 splitters + 0 return mergers (tree 2×2)
Copper IngotCopper Ingot → Wire
120Mk.2
15/minMk.1
7Balanced alternative: 7 splitters + 0 return mergers (tree 2×2×2)
Steel PipeSteel Pipe → Stator
15Mk.1
15/minMk.1
0Balanced alternative: 0 splitters + 0 return mergers (direct belt)
WireWire → Stator
40Mk.1
40/minMk.1
0Balanced alternative: 0 splitters + 0 return mergers (direct belt)
WireWire → Cable
200Mk.3
50/minMk.1
3Balanced alternative: 3 splitters + 0 return mergers (tree 2×2)
StatorStator → Automated Wiring
5Mk.1
2.5/minMk.1
1Balanced alternative: 1 splitter + 0 return mergers (tree 2)
CableCable → Automated Wiring
100Mk.2
50/minMk.1
1Balanced alternative: 1 splitter + 0 return mergers (tree 2)
Output collection and shared-material branches
MaterialMergersBranch splittersDestinations
Steel Ingot0 mergers0 branch splitters22.5/min to Steel Pipe
Steel Pipe0 mergers0 branch splitters15/min to Stator
Copper Ingot3 mergers0 branch splitters120/min to Wire
Wire7 mergers1 branch splitter40/min to Stator; 200/min to Cable
Stator0 mergers0 branch splitters5/min to Automated Wiring
Cable3 mergers0 branch splitters100/min to Automated Wiring
Automated Wiring1 merger0 branch splittersStorage or delivery
  1. Build 1 × Foundry for Steel Ingot at approximately 50% each. Supply 22.5 Iron Ore and 22.5 Coal per minute. Collect 22.5 Steel Ingot per minute, then connect to the downstream groups shown above.
  2. Build 1 × Constructor for Steel Pipe at approximately 75% each. Supply 22.5 Steel Ingot per minute. Collect 15 Steel Pipe per minute, then connect to the downstream groups shown above.
  3. Build 4 × Smelter for Copper Ingot at approximately 100% each. Supply 120 Copper Ore per minute. Collect 120 Copper Ingot per minute, then connect to the downstream groups shown above.
  4. Build 8 × Constructor for Wire at approximately 100% each. Supply 120 Copper Ingot per minute. Collect 240 Wire per minute, then connect to the downstream groups shown above.
  5. Build 1 × Assembler for Stator at approximately 100% each. Supply 15 Steel Pipe and 40 Wire per minute. Collect 5 Stator per minute, then connect to the downstream groups shown above.
  6. Build 4 × Constructor for Cable at approximately 83.3333% each. Supply 200 Wire per minute. Collect 100 Cable per minute, then connect to the downstream groups shown above.
  7. Build 2 × Assembler for Automated Wiring at approximately 100% each. Supply 5 Stator and 100 Cable per minute. Collect 5 Automated Wiring per minute, then send it to storage or Space Elevator delivery.

Manifold counts use one tap between consecutive machines and one branch between consecutive destinations. These are a reproducible connection choice, not a claim of the minimum balanced splitter tree. Compare balanced conveyor splits.

Where is Automated Wiring used?

These recipes consume Automated Wiring directly. Consumption is per downstream building at 100% clock; use the per-product ratio to size a shared supply line.

Direct Automated Wiring consumers · Game data v1.2.3.1 exported 2026-06-25 · computed 2026-11-08.
Product / recipeDownstream buildingAutomated Wiring/minAutomated Wiring / product
Adaptive Control Unit calculatorAdaptive Control Unit · standard
Manufacturer
5
  • 51 Adaptive Control Unit/min

Space Elevator Automated Wiring demand by phase

Phase totals are our calculation from stored standard downstream recipes. Game data v1.2.3.1 exported 2026-06-25 · computed 2026-11-08. The Project Assembly phase table’s retrieval date was not recorded. Totals cover each full delivery batch at 1× requirements with no prebuilt inventory. Direct Automated Wiring deliveries are labelled separately from Automated Wiring embedded in other parts through standard downstream recipes. Alternate downstream recipes can change embedded demand.

Space Elevator Phase 2: Construction Dock

The complete phase delivery unlocks Tiers 5 and 6. Total Automated Wiring supply: 100.

  • 100 Automated Wiring delivered directly.

Automated Wiring supply time: 40 minutes at 2.5/min; 20 minutes at 5/min; 10 minutes at 10/min; 5 minutes at 20/min. This covers this ingredient alone; startup, downstream production, other materials and delivery determine overall completion time.

Space Elevator Phase 3: Main Body

The complete phase delivery unlocks Tiers 7 and 8. Total Automated Wiring supply: 500.

Automated Wiring supply time: 200 minutes at 2.5/min; 100 minutes at 5/min; 50 minutes at 10/min; 25 minutes at 20/min. This covers this ingredient alone; startup, downstream production, other materials and delivery determine overall completion time.

Space Elevator Phase 4: Propulsion

The complete phase delivery unlocks Tier 9. Total Automated Wiring supply: 5,000.

Automated Wiring supply time: 2,000 minutes at 2.5/min; 1,000 minutes at 5/min; 500 minutes at 10/min; 250 minutes at 20/min. This covers this ingredient alone; startup, downstream production, other materials and delivery determine overall completion time.

Space Elevator Phase 5: Assembly

The complete phase delivery unlocks Project Assembly launch; 'Employee of the Planet' Cup in the AWESOME Shop. Total Automated Wiring supply: 2,500.

  • 1,000 × Biochemical Sculptor × 2.5 Automated Wiring each = 2,500 Automated Wiring embedded in those parts.

Automated Wiring supply time: 1,000 minutes at 2.5/min; 500 minutes at 5/min; 250 minutes at 10/min; 125 minutes at 20/min. This covers this ingredient alone; startup, downstream production, other materials and delivery determine overall completion time.

Space Elevator phase plans · Phase delivery reference.

Automated Wiring FAQ

How many Assemblers make 5 Automated Wiring per minute?

Use 2 Assemblers at 100% each with the standard recipe. The complete line consumes 22.5 Iron Ore + 22.5 Coal + 120 Copper Ore per minute and 114.708 MW at the listed clocks; extraction and pumps are additional.

Is the Automated Speed Wiring recipe worth it?

Automated Speed Wiring makes 7.5/min per Manufacturer, using 0.5 Stator + 10 Wire + 0.25 High-Speed Connector per Automated Wiring. Standard support requires 2.25 Iron Ore + 2.25 Coal + 10.5 Copper Ore + 8.4 Caterium Ore + 1.5 m³ Crude Oil per item, versus 4.5 Iron Ore + 4.5 Coal + 24 Copper Ore for the standard recipe. Chain power is 21.747 versus 23.467 MW per Automated Wiring/min at full-clock equivalents. Its direct inputs replace Cable with Wire and High-Speed Connectors; standard High-Speed Connector support still uses Cable. Choose it when those supply chains are available, after selecting the alternate through Hard Drive research.

How much Automated Wiring does Space Elevator Phase 2 need?

Phase 2 needs 100 Automated Wiring as one part of the delivery, alongside 1,000 Smart Plating and 1,000 Versatile Framework; the complete delivery unlocks Tiers 5 and 6. One supplied standard Assembler takes 40 minutes; at 5/min it takes 20 minutes. Startup, downstream production and delivery add time. Later direct and embedded demand is listed in the Space Elevator Automated Wiring demand by phase section above.

Automated Wiring at a glance

Made in
Assembler
Recipes
2 (1 alt)
Sink value
1,440 pts
Used in
1 parts

Automated Wiring is produced in a Assembler from Stator, Cable, and has 1 alternate recipe you can unlock for different inputs. Sinking it in the AWESOME Sink is worth 1,440 points each. It is an ingredient in 1 other recipe, including Adaptive Control Unit. Use the calculator above to scale Automated Wiring to any output rate and see the full machine, resource, and power breakdown.

Automated Wiring is used to make